Coles Knapp provide ECO calcs for Towers

  29th Apr 2015


Tower block Flint EWI ECO EPC

Coles Knapp have provided the EPCs and ECO calculations for the renovation of Flint’s famous 3 towerblocks, Bolingbroke, Richard and Castle Heights.

The methodology included a rigorous sampling approach that met the Government guidelines and enabled the carbon savings to be accurately modelled without disturbing all of the residents.

The work, which will include External Wall Insulation (EWI) and new windows will increase the comfort levels of the flats and reduce the energy bills and carbon emissions.

It was a great project to work on, with a forward thinking Local Authority and some lovely tenants – as well as the spectacular views across Flint Castle to the Wirral and Liverpool!

More can be read about the scheme at the Daily Post site

gaymovies.cc