Recent Projects

John Lewis New Street Birmingham

Fit out BRUKL for Part L target emissions and Level 5 EPC on completion of the landmark new John Lewis at New Street station.

Aintree Retail Park

Non domestic EPC for new lease

LCCC – New Hotel, Manchester

Designbuilder modelling and BRUKL (including compliance advice) were provided for this landmark new hotel fronting the Old Trafford cricket pitch

National Memorial Arboretum Visitor Centre

Coles Knapp provided the Non Domestic EPC on completion of construction for this stunning new visitor centre at the National Memorial Arboretum.

Queens Retail Park, Stafford

Non domestic EPC provided for managing agents

Hall Square, Denbigh

Coles Knapp provided the Non Domestic EPC for the new lease at this well known office building central in Denbigh

Flint Heights Project

Coles Knapp provided the RdSAP EPCs for 270 flats in the three blocks in Flint, North Wales to enable the carbon savings for ECO to be calculated for the proposed external wall insulation and new windows. We used a robust sampling methodology to ensure minimum disruption to the residents.

Eastgate House, Cardiff

Non domestic EPCs provided for vacant suites in this office tower.

Livingstone Place (former HM Stanley Hospital suite) St Asaph

SAP calculations and Part L compliance, plus SAP EPCs on completion. 83 luxury new dwellings on the former hospital site for Pure Residential & Commercial. This project include re-running multiple times to attain a TER pass that worked across all house types yet kept one cost effective specification across the site.

Hotel Football, Old Trafford, Manchester

We assisted with the HVAC design compliance with this landmark hotel from an early stage after the proposed CHP was dropped from the project. Compliance was obtained by utilising high efficiency VRF sytems throughout the building as PV was not a serious option due to the rooftop five-a-side pitch. Coles Knapp also provided the As Built compliance and EPC.